冰球突破-MG冰球突破试玩冰球突破

hg体育游戏 中国博彩平台排名 最全博彩平台 博彩app平台 十大网赌正规平台 Skip To Main Content

Logo Image

Ann Arbor Public Schools

Logo Title

Facility Condition Assessment Reports


In 2018 AAPS commissioned a district-wide Facility Condition Assessment (FCA)
 
  • EMG logo
    EMG Corporation was awarded a contract to conduct the FCA.
     
  • FCA is life cycle engineering analysis of the condition of a facility in terms of age, design, construction methods, and materials.
     
  • The analysis is done by walk-through inspection and mathematical modeling. It includes calculations of useful life and conditions of building systems and equipment.
     
  • The FCA identifies needed infrastructure investments and risks associated with continued deferral of maintenance and replacement investments.

FCA Executive Summary - December 2018


Individual Facility Reports

bet365中国官网 赌博大全 最全彩票平台 比较正规的赌博软件 亚洲体育博彩网赌网站排名